production data collection entry capture software system entries efficiency downtime delays rate analysis tool workcentre

To contact us

 

 

Privacy Policy

 

 

 

 

 

 

 

Copyright 1996-2004

 

helping people to drive            

 their production efficiency

Presenting  dbPEP

Whether your plant has 10 employees or 500, is based on manual assembly or automation,  it does not really matter; there are so various scenarios to use dbPEP that can be so handy to you!   Click here to see them. 

If there is such a thing as a low-cost application that can help you save several thousands dollars a year, dbPEP qualifies easily !

This process includes simple steps;
- Populate the support tables Work centres, operations et delay codes, work shifts et production standard rates).
- Enter production entries and data directly in dbPEP or
- Get them from an import file.
- Review and calculate the production entries, approve them.
- Document the production entries.
- Publish the data and compiled results or
- Export them as editable files.
- Build suggested new production standard rates depending on past results (you can select which entries are considered for compilation).

 

Also, you have support features that will make these steps easier.
- Automatic timer to enter your production entries accurately.
- Networking to share data efficiently and
multiple data files support, for easy archiving.

- Online help files.
- Approval Tracking System for managers.

- Upload Tracking System to help you update your ERP/manufacturing system.

- Automated import and export of several CSV files*.
- Automated reports by e-mail*.
- User-level security with passwords.
- Available customization to make a great integration.
 

* for licenses of 3 users and up.
 

Specifications
- Each data files can hold approximately 200 000 records each. A company running 10 lines on 3 shifts, creating 10 production entries by shift should produce 70 000 records a year.   You can have an infinite number of data files.   The system is fully up scalable to ODBC technology (SQL based data engine) after an upgrade available at Soramtec inc.


Requirements
- Microsoft Windows 98/NT/2000/XP with Microsoft Internet Explorer 4.0 and higher
- 64 Megs of RAM.
- 20 Megs of hard drive for nominal installation; data will take space as required.

- Screen resolution 800x600 or better, true colors.
- MAPI Microsoft compatible e-mail system for optional use of e-mail.
- If you have any parts of Microsoft Office 97 on your workstation, as a preventive measure it is highly recommended that you install  Service Release 2 (SR-2).
- We strongly recommend an Uninterrupted Power Supply device.

 

 

 

 

Click on thumbnails to see actual screen shots

(image quality may vary with your configuration.  Better viewed with 1024x768 resolution full screen)

User-level security

Main menu

 

Exchange Centre

 

Build an history of your production standard rates.

 

Enter production entries with the help of an online timer

 

Each of your production entry can be analysed

 

Document your production entries with multiple notes.

 

The system will compile history and propose you new standard production rates

 

The Report Centre is a flexible tool to present your data and get analysis.

 

Example of the several standard reports

 

Example of the several standard charts

production data collection entry capture software system entries efficiency downtime delays rate analysis tool workcentre